WeGo Public Transit
The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
WeGo Public Transit is seeking bids from qualified firms to replace the existing sewer line at the west side of the Nestor Facility located at 130 Nestor Street, Nashville, TN 37210. To obtain bid documents, please use link below and download ITB 2023106 - Nestor Facility Westside Sewer Line Replacement. Deadline for submitting bids is 2:00 PM CT, May 11, 2022. This project has a DBE participation goal of 5%. A pre-bid meeting will be held via WEBEX on April 21, 2023 at 10:00 AM CT at the Nestor Facility. Please email [email protected] to register for pre-bid meeting. WeGo Public Transit is an equal opportunity, equal access, affirmative action employer. This project is funded under a grant contract with the Federal Transit Administration and the State of Tennessee
Note: Bids are subject to review for completeness, accurary, and compliance with all terms and conditions in the bid specifications.